Large Load Tariff Tracker
New July 23 2025 | Total 35 Tariffs 39M Customers Served
Large load tariffs are specialized electricity rate structures designed for customers whose power demand is significantly higher than typical residential, commercial, or small industrial users. These tariffs are used to allocate costs more equitably based on usage, ensure grid stability, and manage the financial risks associated with serving very large, often system-altering, loads—such as data centers, industrial facilities, or other hyperscale users.
Common thresholds for categorizing "large load" customers vary by jurisdiction but typically range from 1 MW to 100 MW or higher. Halcyon’s Large Load Tariff Library allows users to rapidly understand the varied landscape across key dimensions.
Reach out to access the full dataset

Data Center Developers
Understand current and future market conditions to find the most affordable places to build
Utilities
Follow and analyze approved tariffs nationwide to stay competitive and grow revenue
Policy Analysts
Monitor state-level approaches to attract large industrial loads
Consultants
Identify supply/demand mismatches to inform modeling and cost/benefit analysis
Data Preview (showing 3 of 35 Utilities)
Data Methodology
Halcyon’s Large Load Tariff Library allows users to rapidly understand the varied landscape across Utility Data (42 data points), Numeric Data (6 Related Tariff details), and Market Context (A deeper exploration of 14 legislative drivers of the tariff proposals). A detailed list of data items below.
The tracker will be updated on a monthly basis to incorporate new tariffs and back fill those at other entities (large municipalities, cooperatives, federal power authorities) as information is available. Quarterly refreshes will update the full dataset.
Utility Data
Field |
Description |
Utility |
Investor Owned utilities over TK MWh served |
DBA |
Tradestyle/does business as names of the utility subsidiary or other business unit |
State |
State this tariff is active in |
Docket |
Identifier used by state PUC |
Docket Name |
Name of docket (Petition for approval of "Large load rate") |
Status |
Flag for whether this docket active/open/ongoing |
Tariff Name |
Name of plan offered to customers ("Large load rate") |
Description (From Docket Profile Page) |
Halcyon generated summary of the docket proceedings |
Docket Start date |
First document publication data |
MW Threshold for Data Centers |
Megawatt threshold at which the highest load is served for each utility |
Voltage Threshold (kV) |
Kilovolt threshold at which the highest load is served for each utility |
Active date |
Start date of tariff for customers |
MW threshold for Crypto and/or mobile applications |
Megawatt threshold specified for crypto and/or mobile applications (if specified) |
Minimum demand threshold / Load Factor |
% of maximum load that the facilities has to maintain (if specified) |
Long term contract requirements |
Duration of contract in years |
Rules on Renewals and amendments |
Any rules specified in the tariff |
Minimum Monthly Demand Payments |
Minimum payments (if required) |
Exit Fees |
Payments required from a developer to a utility if a datacenter does not meet its contractual obligations |
Collateral requirements |
Posting requirements for |
Riders |
Riders |
Proposed Timeline |
The timeline of events proposed by the utility to see a decision on the tariff |
List of Commenting Organizations |
List of Commenting Organizations |
List of Intervenors |
List of Intervenors |